Saturday, 10 November 2012

Maintenance Progress

Bruce, Steve and Ingo painted the tender coal space with bitumastic paint.

The coal space was brushed down and vacuumed to remove all loose debris. This area was painted while the drawbox and footplate areas were cleaned.

The back deck was cleared of wood and debris. Localised patches of damp were cleaned up and dried with the hot air gun. Loose and cracked paint was wirebrushed and chipped as appropriate. The entire deck area was vacuumed to remove loose debris.
 
  
Tender Coal Space
Tender Coal Space
 
By the end of the day the entire coal space had received one coat of bitumastic paint and requires at least 24 hours drying time before a second coat is applied. The rear deck and under the footplate are ready to start painting.

Meanwhile Gilbert and Geof were working on the tender axleboxes. See later post on this blog.

No comments: