Wednesday 3rd
John G began the day by stamping an identifier on each of the underkeep straps and then painting them black (see photo). After lunch he joined the Pony Club.
… and while you are looking at the first photo, guess the cost of the bolt. This is one of the four fitted bolts to secure the RHS rocking shaft housing to the loco frames. It is five inches tall and has a diameter of one-and-a-quarter inches. Answer below!
During the morning, our two invalids, Gilbert & Bruce, measured every conceivable dimension on the pony frame in order to decide if the height is right. Having inserted the rubbers (exactly those ones that came out) into their bell-housings, they appear to sit about an inch higher than before they were interfered with. Why? Who knows! My guess is that six-plus years of having 7 tons on top of them squelched them a bit, and now having two months without, they relaxed. However, G&B decided to remove two 1/4" rubbers from each side … which meant disassembling the pony again! It was back together by lunchtime, though.
Determined to get the pony back under the loco today, I pressed on by jacking the loco up.
After lunch it was all hands to the pony (i.e. John G, Mike W, plus several Loco Dept chaps (Tim P in particular); even Gil decided to stay on, though his leg prevented him from doing some things).
Rolling the pony along is the easy bit. The buffer beam has to be high enough to get them under, of course, but a whacking great beam has to be low enough to slide the frame of the truck over it. If it goes too low, it clobbers a cross-member that operates the drain cocks. Once the "pointed end" of the frame is past the mid-point of this beam, a roller has to be inserted between beam and underside of the cylinder block.
Then the truck is eased into place, with the beam being adjusted to clear the axle, and the loco frame gradually lowered to manoeuvre the pony frame backwards. This, too, had a habit of fighting that cross-member for the same space! At one stage, we realised that while trying to lift the beam high enough to clear the axle, we were in effect attempting to lift the entire loco, because the roller had engaged and the jack was now trying to push the cylinder block upwards! It really was inch-by-inch.
Back at the "sharp end", the newly-bushed link had to be slid into the newly reamed bridge to line the three holes up. I was yelling (above the needle-gunning and riveting noise from the group next to us) to push "an inch" at a time, as I lifted the front of the frame to slide into the bridge. We got it "almost there" by 4 pm, when the chaps decided to pack up for the day. Since I was stuck between the frames, with the securing pin through two of the holes, I decided to press on. I was able to lever the front sufficiently up/down and side-to-side such that after 20 minutes of fiddling, the pin dropped into place!
All of this time, we were watching the two oilers that dangle down and sit on top of the pony. The loco couldn't be lowered to engage the newly-machined discs on their bottoms until the to & fro movement had finished. They survived! All that remain now is to lower the big chunky weight down from in front of the smokebox and connect the bottom of its link ("Exhibit A") into the end of the beam ("Exhibit B").
Answer to quiz question: The four fitted bolts cost £152 + VAT, so that's £38 each!
Saturday 6th
Bruce was AWOL today, but Donna and Graham from Loco Dept assisted us all day.
I arrived first, so I set up the tackle & pulley to enable us to lower that thunking great weight down onto the pony.
Then Gil suggested that we should fit the large tie-bar frame to the bottom of the pony (it stops the hornguides from spreading under load) before dropping the weight. Much levering and laying down on the job failed to get the 8 bolts to engage in the frame. It is difficult lifting a heavy object upwards, especially when trying to line up bolts & holes. However …
…a voice from the Back Left corner said: “There’s an RF stamped on it here!”
We adjourned for tea break!
Back out again, we turned the frame round and started again. It was still a struggle getting all bolts to fit at the same time, but we got it up and nuts on … though one bolt refused to allow its nut past a couple of turns. We’ll tackle that when 2807 is over a pit.
We still have to finish and fit the underkeeps. The insides need some rough edges grinding off; the bottoms need a drain hole, and the new oil pads need oiling.
Donna was assigned to oil duty, then assisted John making drain holes. The purpose is to easily release any water that collects in the underkeeps. It’s simply a job of drilling, tapping and fitting a small bolt. I won’t embarrass them by saying what happened!
Incessant rain prevented angle-grinding (outside) so the underkeeps remain uncompleted.
Back at the loco, we had to crawl under and jack up the heavy beam to position it below where the eye of the bolt through the weight was going to fall, for them to engage.
As I lowered it, Donna fitted the pin through. Then all we had to do was tighten the nut down on the top, fit a locking nut and a securing bridge on top and put the bell housing back on. Believe me, there was no way that nut would tighten (because it was effectively lifting that beam plus the share of the weight of the loco on the pony! Brainwave: Jack up the beam (again!) to take the weight and then try.
I crawled back under, and jacked; Graham played with the nuts and bridge. You have to get the height right and a split pin through the bridge piece.
Success! Then, while Graham fitted the running board back in front of the RHS valve, the rest of us put things away and tidied up.
The next item on the critical path is to ream out a second hole on the RHS rocking shaft bracket. It was too late in the day to start upon that.
Roger
Sunday, 7 February 2016
Sunday, 31 January 2016
Maintenance Update (paint, pin, pony)
Wednesday 27th
Gilbert
made a flat metal template to the same diameter as the new bush, such
that when the pony frame is heated (to expand the hole) we can gauge the
size vis-à-vis the actual bush (without having to risk getting it stuck
in the hole). He also removed the front cover from the LHS piston
valve.
Just
before end-of-play, John helped Bruce lower the loco frames off the
jacks. The frame has to be raised for the reamer to get through the
hole …
…
that Bruce was reaming all day long! Finally, he has reamed it out to
the required size for the new pin to fit. Below this hole is the one in
the pony frame that needs a new bush. To fit the bush we think we
will have to heat the frame to expand it, because it has to be a tight
fit, of course.
I
decided to tackle as many small jobs as I could, because we only have 4
weeks left to get the work done, loco steam tested and ready to run! I
refitted the section of running board to the rear of the LHS valve
(Bruce had noticed two bolts missing from it); fitted the LHS front
cladding on the cylinder; filed a shade off the RHS running board where
the rocking shaft arm had been clobbering it; fitted the vacuum gauge
(but can't fit the pressure gauges until they have been tested);
Bruce
reminded me of a suspected steam leak from the pep pipe (aka slacking
pipe - in the cab), so I inspected the pipe twixt pep valve (in the cab)
and steam feed pipe (from injector to top clack) and discovered that
the pipe had been rubbing against platework beneath the cab. So, the
pipe had to come off. There appears to be a minute split in the pipe,
but Carpo says to hydraulically test it to see how bad it is; it may be
possible to simply silver-solder it up (and then move the pipe away from
the side!).
Saturday 30th
Today was tremendously successful - we really felt we had achieved something. Why? Because the wheels are back on the pony!
There
were two primary activities converging on assembling the pony:
finishing off the underkeeps; and getting the pony frame together.
David and John T spent most of the day completing the straps that hold
the underkeeps up. David had already cut these (4 of) to correct width
with neat edges at home, and now these needed cutting to length and
holes drilling in them for the retaining T-bolts. Inevitably this was
not trivial, as the bolts turned out not to have long enough threads,
and David had to die-cut them to length. The straps have to butt up to
the four tabs on the underkeeps (to prevent the underkeeps from moving
sideways), so getting the holes positioned accurately took time, too.
When
they had completed that work, we could press on with pony assembly;
meanwhile David and John tackled the first of four fitted bolts on the
RHS rocking shaft bracket. The bolt hole was reamed to within 1 thou of
the bolt diameter and the bolt was then persuaded to go home! This
turned out to be challenging, and David recommends not being quite so
tight on the next three!
Bruce
is concerned that the 1/32 inch freedom ("slop") allowed on the pony
pivot pin will only allow the pony wheels to lift by about 1.5 inches,
which is a problem when being loaded onto a lorry! Bruce sought the
opinion of various oracles, but didn't come to any conclusion. Further
investigation is required.
Gil
had ordered oil pads to fit in the underkeeps. These suck up oil by
capillary action and rub it on the axle journals. However, we think the
ones delivered are the wrong sort! Gil & Bruce to sort this out
ASAP.
Alistair
and I began the day by moving the A-frame down to position it above the
pony frame. Then Alistair raised the frame and we swung it round to
give access to the pivot point where the new hardened bush had to be
fitted. We then had to wait until Carpo had time to act as Lucifer. It
took less than 5 minutes for him to heat up the frame; Bruce slipped
the bush into the hole, and with very little persuasion it slid into
place.
Meanwhile,
much shunting was required in order to get the pony wheels from Road 6
onto Road 7. With help from various Loco Dept chaps, chivvied on by
Clive, 4270 and Foremarke's tender were shunted out, and then a few of
us pushed out the wagon (which is under restoration) to free up the
Road. The wheels were shifted across from Road 6 by fork-lift;
deposited on Road 7, and rolled carefully down to the frame. Ray O'H
was hovering around with his camera, so photos of this activity may
appear on the Loco Dept Blog next week (see http://gwsrsteamloco.blogspot.co.uk/).
Alistair
and Mike cleaned and oiled various parts of the axle; boxes and frame.
The final parts of the axle boxes were assembled (i.e. top cover and
rubbers). Eventually, they were ready to fit.
This is a bit of fun,
because if we were to just balance the axlebox on top of the axle, it
would (obviously) swing round and drop off! So they had to have a pile
of wood underneath to prevent them from rotating on the axle. Alistair
again was in charge of the lifting, as the frame took to the air. I was
steering at the sharp end, while Bruce and Mike were manipulating the
wheel end. After much wiggling, jiggling and persuading, the frame did
drop onto the axle. Job done - almost!
Bruce
compared the height of the top of the frame to axle centre with the
drawing, and it appears to be 1.5 inches too high. It has clearly been
too high while in service for the past five years. Nevertheless, we
shall verify this measurement next time, and if appropriate we can lift
the frame again and remove one or two rubbers.
Roger
Sunday, 24 January 2016
Maintenance Update (swage, reaming, rock)
Tuesday 19th
I
popped down for a while to complete the four boot scrapers.
Wednesday 20th
Bruce
brought in the piece of test pipe and the gadget he made to swage the
end. The new pipe has a much thicker wall than the original (top in the
photo) so Bruce did two tests - one to swage out the pipe as is; and
then he drilled out the other end to the same wall thickness as the old
pipe before swaging that. Needless to say, the latter was the easier to
do! However, The Oracle was not happy with the drilled out idea.
Bruce decided to make a Mk II (shiny silver) piece to make the opening
out easier to do.
Bruce's
other job for the day was to finish off the sides of the newly machines
underkeep such that it slides smoothly in the axle box guide.
Basically, it was taking off the high spots. Photo shows it in place
beneath the axlebox. We need the second one doing before we can fit the
wheelset back in the pony.
Gil
cleaned up the face of the RHS rocking shaft cradle - there appeared to
be some minor high spots around the bolt holes. Then he spent the rest
of the day reaming out the one fixing bolt hole into which we are using
a fitted bolt (to try to stop the unit from moving when the loco is in
motion). We don't have time to do all four bolts at the moment.
I
removed the top cover of the LHS rocking shaft and inspected the
cover. With Gil watching carefully, I waggled the reverser to & fro
to see what sort of movement there was in the brass bearings. They
only seemed to move up & down (caused by the lack of top cover plus
the direction of force from the intermediate valve rod). Dixie cleaned
up the nuts, bolts and stud; I ran a flat file over the surfaces of the
top piece and bottom piece to check for high spots, then Dixie and I
reassembled it. There had been no observed issue with this side in
service, and nothing visibly amiss now.
Dixie
has already extracted the studs from the RHS and cleaned those, which
is why he was into cleaning the threads on that side .. and subsequently
on my side.
John
G was quite keen on painting the entire pony truck, but I persuaded him
that the front buffer beam is more visible and in need of touching up..
John had a go at cleaning the paintwork but then decided that it really
needed touching up .. which he did.
For
a while, I had been 'bugged' by the fact that our AWS unit in the cab
(kindly bought & donated by John G) is eye-catching, but not
connected to anything. We would like to have (had time to) fit some
pipework to make it appear to be fully connected. I had an inkling that
the original pipework is on the ground beneath our TPO. John had a
look; then went looking at other locos, but found that no two are the
same (surprise, surprise!). So, he's going to look at the photos of
2807 in Barry to see if there is one showing the position of the pipes.
Thursday 21st
Gil & Geof went to Buckfastleigh (via Torquay to deliver a boot scraper) to collect the pony wheels. Rob Le C had emailed:
"Hi Gilbert,
There
is good news and bad, the good news is they are ready for collection
unfortunately they went a bit over budget as the tyre width was way out
of specification at over 6” so we have had to machine the front of the
tyres as well as profile them therefore the final cost is £720.00
Hope this is ok".
They
arrived back at Todders circa 5.20 pm, where Carpo and I were ready and
waiting! We unloaded the wheels (in the dark); packed up, and G&G
drove the truck back to Winchcombe station yard.
Saturday 23rd
Lots of people here today (seven), all beavering away at something … apart from me!
John
T cut the straps to width, for fitting beneath the pony underkeeps
(i.e. to keep them up!). David has taken them home to trim up the
edge.
Later, John joined the team fitting the valve cover back on the
RHS.
In
the dark on Thursday, it was a 50-50 chance that the pony wheels were
the right way round on the track … they weren't! Adey S [Loco Dept]
used the fork lift truck to turn them round for us. Brian then cleaned
up the pony wheels. SDR had coated them with waxoil, which Brian
removed. He also removed flaking bits of paint from spokes and hubs;
then he applied a primer to the outer face of tyres and the hub, ready
for painting black next time.
Interestingly,
the wheels have things stamped on them: 90T 75DG and PA4027. The
latter is probably a part number, and the former may be 70 tons pressure
required to fit wheels to axle. What's the 75DG, then?
Alistair
measured the coupling rods again, as Gilbert had brought a diagram with
dimensions on that were legible. Alistair's measurements confirmed
that there is too much play, and our rods are not quite (!) to diagram.
JC advised us to re-bush the inner rod end when we have time - not
urgent. Alistair went on to assist with the valve cover (it is a shade
heavy and awkward to fit into place). Finally, he assisted Bruce,
fitting the little cross-head thingy for the RHS valve rod to fit in to.
Bruce
began by fettling the underkeeps to ensure that their bottoms were not
proud of the axlebox itself. The straps must not be tight enough to
force the underkeep to press upwards onto the axle, but must not be
loose enough to let it waggle about. There is also the need to make the
"hole" the same size as the axle.
Later in the day, Bruce moved on to
the RHS valve; in particular fitting new packing in the gland.
David
spent much of the day with Gilbert reaming out the one hole for the
rocking shaft bracket. David had skimmed a shade from the rocking shaft
cover, and these and their brasses now fit tightly together. We
decided to get four new bolts made for this bracket, such that in due
course it will have fully-fitted bolts to ensure that it cannot move at
all. David finally made a jig for the loco-to-tender steam heating
connection. New connectors are being delivered (of a diameter that
suits BR hoses) next time, and David will cut & weld the pipework to
fit these.
I
did little things, to little effect! The electrical conduits on GWR
locos for connecting the ATC shoe to the battery box and in-cab
equipment seem to vary from one to another. Gil thought there might be
some of our conduit in the siphon, so I zoomed off to Winchcombe for a
search. There is one piece, about 10 ft long! However, it gave me a
chance to say "Hello" to Fred and Bill, who were busy painting pieces of
wood inside the siphon. Fred introduced me to Horace and Doris, the
resident robins, who were generally keeping an eye on what Fred &
Bill were up to! Unfortunately, I hadn't taken my camera along …
David Moore writes:
" Fancy a private reg for your car?
‘2807 JB’ is being auctioned on-line by the DVLA but the reserve is £1500! Pass on if you think anyone else interested.
Check out www.dvlaauction.co.uk to view."
Roger
Sunday, 17 January 2016
Maintenance Update (brushing, rocking, manipulating)
Peter Radford alerts us to …
"I thought "you and yours (within 2807 circles)" might like to know that
there are some nice pictures of 2807 in "Bachmann Times", Volume 16
Number 2 (Winter 2015), which I've just read (borrowed from Arthur
Dransfield).
They were taken at the Bachmann Collectors Club Members Day on 5th September.
(Rather like Kings Place, they don't seem to bother with apostrophes!)"
They were taken at the Bachmann Collectors Club Members Day on 5th September.
(Rather like Kings Place, they don't seem to bother with apostrophes!)"
Wednesday 13th
Gil,
Bruce and Dixie got on with playing on the loco, but I was concerned
that there are urgent jobs to do … but that can't be done until the pony
is reassembled. The result will be (he predicts) a mad rush in
February … when I won't have time to build up boot scraper stock! But
first, I decided to slap some paint in the notice (display) board which
suffers in the sunshine. Barely had I begun, when Chris [Loco Dept]
came looking for us, because an assignment of brushes had been
delivered! 504 of. "Where did we want them?" Much re-arranging of
shelves ensued! Eventually I managed to stack the 21 boxes and finally
clean four rail chairs …
Dixie
spent most of the day trying to remove the RHS rocking shaft. The
intermediate valve rod is attached to the inside arm of the rocking
shaft by a tapered pin. This has to be removed in the inwards
direction, but there is no room between pin and loco frame to, as Dixie
put it, "Give it a wallop!". All you can do is apply pressure and whack
the arm, hoping to give it a big enough shock to break its grip on the
pin.
Apart from measuring things (mainly holes), Gil also assisted Dixie.
Bruce
also did some measuring, on the pony frame. He's trying to ensure that
the top of it ends up horizontal! Our pony doesn't match any of the
formal diagrams (gosh, that's a surprise) so Bruce is struggling to make sense of the actual dimensions of ours.
Bruce
also spoke with JC about the steam heating connection between our loco
& tender. We are getting new connections so that they fit a
standard BR hose, rather than the narrower GWR hose. JC is having them
made. There is some debate as to the angle that the connections should
be pointed at!
Also,
Bruce borrowed a swager from JC for the end of the new bit of copper
tubing between Y-splitter and condensing coil (in the cab roof). He's
decided to make one that is a better fit for our tubing.
Late
in the day (3.50 pm), I thought the chaps had given up, so popped into
the shed to take a photo. Then all three of them materialised as if by
magic! Gil & Dixie explained how they had been unable to get the
rocking shaft out of its cradle as there is insufficient height to raise
it up (to do so invokes a spacial conflict with the boiler). So, I demonstrated that with a long bar and a fulcrum (block of wood)
I could raise it out of its cradle. Gil & Dixie (with
encouragement from Bruce) then manoeuvred the rocking shaft towards the
rear of the loco (i.e. not vertically upwards) as I held it above the
cradle and its nuts. So, in a very short while the whole thing was out,
split and tidily laying on the running board.
At
first sight, the brass half-shells seem fine - no scoring or anything.
The cradle top & bottom seem fine - no obvious sign of wear.
Thursday 14th
One
boot scraper order (for delivery to Devon!). Had to dash over to
Todders and paint some bottoms, quickly! Slapped an additional coat on
the display board while I was there.
Sat reading, for a while, hoping to catch a glimpse of the new mouse (family). Not a sound!
Friday 15th
Just an hour applying the primer coat to the tops of the four rail chairs. Paint on the display board frame not dry yet!
Saturday 16th
The
pony axleboxes received some attention: It had been noticed that the
lubrication was previously suboptimal, in as much as oil was not readily
both sides. So, David made a second hole, including a spot of welding,
to remedy this. John T cut four pieces of metal to use as straps to
hold the underkeeps in position. This is only necessary because the
castings are not designed for a 28xx and the bolt holes would be in the
wrong position … so we cut most of those lugs off (other than enough to
prevent the underkeep from sliding sideways) and fix them up using two
straps. John also cut felt pads and tidied up some errant white metal.
The
RHS rocking shaft was next. Gil cleaned the rocking shaft and noticed a
mark, where paint had been chipped off, indicating that the outside arm
hits the running board when in full gear (which is rare, but may be
used when starting off). You can see the spot in the photo.
So, I
toddled off to the shed to inspect the running board, and sure enough …
the LHS is actually bent upwards where that shaft clobbers it!
I
decided to try to tackle some outstanding issues on the log. Issue 39
says that there is excessive play in the gradient pins. Now, I hadn't a
clue what or where the "gradient pins" are! It transpires that they
are the pins that hold two sections of coupling rod together. The end
of one is forked, and the end of the next one slots into the fork. It
took me a while to understand the limits & fits data, but eventually
(with guidance from Gil, Bruce and Adey [Loco Dept]) determined that
the limit of sideways play is 25 thou. There are two of these on each
side, and the play in ours ranges from 80 thou to 130 thou. Whoops!
'Twould appear that we didn't re-bush these when we assembled the rods.
It'll have to wait, because we don't have time to remove the rods and
fix them - mainly because of the pony work (and not being able to move
the loco at the moment).
While
I had the measuring stick out, I checked the big ends (Issues 29 &
30 said that both on sides there was excessive play). For a 2-8-0 loco
185 thou lateral movement is allowed (because of the need to get the
long wheelbase round corners), as opposed to 125 thou for a 4-6-0. Ours
measure between 85 and 145 thou - well within tolerance. So, these two
"issues" were written off!
Bruce
had been measuring the bearing shells in the rock shaft, and trial
fitting implies that they had not been clamped tightly by the cradle.
So, David has taken the top cover home to skim a shade off and thereby
create a firm grip.
Bruce
turned his attention to the little pony oil delivery pipes for which
new, large discs had been made (by David). Bruce assembled the RHS one
and we drew straws for who would crawl underneath; lay on their back and
remove the LHS one …I lost! It was a struggle, but with Bruce holding
the oil pipe back, I had just enough room to unscrew the thing. Bruce
toddled off to fit the large disc. Meanwhile John offered assistance as
I fitted the RHS one.
David
& Gil decided to re-fit the RHS valve rod, which is a heavy beast,
and would cheerfully slide out of the pulley chain and cripple someone,
given half a chance. Having given up waiting for Bruce to come back
with the other oil thingy, I joined in along with John.
The
first valve head goes in easily, but then as it passes through, you
have to align the rod with the hole in the bush at the far end. You can
only do this by manipulating the rod at the front end (because the far
end is inside the cylinder, of course). We have a long pole, suitably
angled to enable the rod to be manoeuvred. Try as we did, though it
started to go into the bush, it stubbornly refused to pass through it.
We waggled it, thumped it, twisted it, swore at it … but no joy. After
half an hour of trying, we decided to give up for the day. Carpo passed
by and, being something akin to a magnet, everyone turned and attracted
his attention. I picked up the pole, again, and said something along
the lines of, "come on you thingy valve, you; get in that hole!"
Rotating the rod in a screw fashion, and pushing at the same time, it
finally gave up and slid quietly into its hole.
Meanwhile,
Bruce had had a spot of bother with the LHS oil delivery thing. The
pipe is narrower than that on the RHS, so it was loose in the hole in
the new disc, plus the spring was wider than that on the RHS and doesn't
fit in the recess in the new disc. Aaaagh!
Time to go home!
P.S.
I found another spring that fits; Bruce found a new split pin that holds it in place … but we still went home!
Roger
Sunday, 10 January 2016
Maintenance Update (sand, spindle, bonnet)
Monday 4th Jan
Having
failed to complete the sand box on Saturday, it irritated me so much
that on Monday I trotted off to Todders and fixed the thing! I drilled
through the split-pin hole and got that fixed. Then there was a linkage
from there to the operating lever - again, a split-pin played up! I
got a new pin, cut it down to size and fitted that, too. The delivery
pipe was the last bit to fit. Then I tested the whole mechanism, and it
works (well, it left a little pile of sand on the rail when I turned it
to 'open'). Enough for today!
Wednesday 6th
I
didn't see much of Bruce today - he spent all day (apart from tea break
& lunch) in between the frames, reaming out the holes in the pony
truck bridge piece. By end of play he has got the top hole to within 2
thou' of being perfectly circular. We now need the new
to-be-manufactured pin to be completed and delivered so that great care
can be taken in matching the hole to the pin.
Gilbert
& Dixie worked on removing the RHS valve and link rod to the
rocking shaft. The whole rocking shaft unit appears to move when the
loco is in service. This might be due to the securing bolts not being
of the "fitted" kind; or it might be due to play in the pin that
connects link to rocker arm; or play in the brass bearing of the rocker;
or a combination of some/all these things! So, it has to come apart.
Separating the valve spindle from its little cross-head was the first
challenge. That took all morning (because of a taper). Then there was
not enough room to release the link from the cross-head (because the
slidebar bracket is in the way); which meant that the spindle had to be
pushed through (and that meant belting it with a 'persuader'!), to push
the link back to the frame and pull its tapered pin free at the other
end! All was achieved by end of play.
Bruce
mentioned that the brass bonnet was only held on by a couple of bolts.
It had been fitted in a hurry by the loco crew - I can't quite remember
why we hadn't had time to replace it. I speculated on why all bolts
had not been fitted … and I leave it to you to work it out from the
photo! :-)
While
up there, I remembered that the safety valves have been reported as
blowing off at 215 (instead of the correct 225 psi). John had noticed
that it is the rear one that blows at 215, so we aim to adjust the
spacer before she goes back into service.
John
G helped me take our display board down (from the car park), ready for
it to be cleaned and re-done for the 2016 season. Then John tackled the
surface rust that had formed on all of the coupling and connecting
rods. He used wire wool plus oil to clean them and give some
protection.
Saturday 9th
We
set Brian on steam-cleaning things. There were a couple of sections of
running board that were really grotty, and I unbolted two more for
Brian to clean. Funny, though, there seemed to be more to clean than we
had removed … the Dinmore Manor group spotted Brian with the steam
cleaner, and started adding their own bits to his pile!
David
brought two "dishes" to fit on the lubricators for the pony. The
original ones were of the wrong type- too small. Bruce assembled one,
but we didn't fit them on.
Bruce
and John T spent much of the day examining the pony axleboxes. John
checked the bearing lubrication, and then assessed what material is
required for two strips per box to hold them in position. Bruce
measured various components to work out exactly what needs to be done.
Adey [Loco Dept] removed all of the tender brake blocks with a view to machining up the new ones to fit.
Gilbert & David concentrated on the RHS valve, finally getting it out by the end of the day.
I
began by removing one of the bolts that fixes the rocking shaft unit to
the frames. We think these should be fitted bolts, and they are not.
David & Gil discussed the best way to make new bolts to suit. Brian
removed the top cover from the rocking shaft so that the bearing shells
can be examined for wear.
Finally,
I went inside the firebox to inspect the nuts & rivets around the
grate area. All seem OK. I cleaned these up and applied aluminium
paint (750 degree heat tolerant), though there was no sign of the paint
that I applied last year, so whether it does any good …
There is now a list of outstanding issues from the loco report card, most of which we shall address in the next six weeks.
Roger
Sunday, 3 January 2016
Maintenance Update (pony, bridge, valve)
Wednesday 23rd Dec
John
G and I spent an hour or so at Todders. John finished off painting the
rail chairs in the boot scraper production line. All I did was
retrieve our socket set (that had been left out on the loco) and squirt
penetrating oil over the nuts on the pony bridge piece (in the vain hope
that it would ease them enough to be undone!). Mind you, this entailed
clambering up onto the loco and down between the frames … and then
clambering back out and then crawling underneath!
Received a bill for fuel from Gilbert - so we know the wheelset arrived safely at Buckfastleigh! :-)
Feedback from SDR on Pony Wheels.
Geof reports: "My understanding is as follows.
Rob
Le Chevalier had a quick look at them and was intrigued; they are
profiled to a non-standard, possibly an old T profile. The inside
wheel-to-wheel flange measurement is slightly in excess of tolerance for
main line running. "They are scrap" were his exact words! Just as
well we have no aspirations in that direction.
SDR
will work their magic to optimise what we've got. They may not be
exactly P profile wheel when they are finished but they will be
perfectly matched. We expect them to be ready for collection end
2nd/beginning 3rd week of Jan."
Now,
I'm pretty sure that we have never removed the wheels from their axle,
so back-to-back they are exactly as they ran in BR days! We did have
the tyres re-profiled, though, by someone who was operating out of the
old Swindon works … in the early 1990s?
Sunday 27th
Both
the Flag & Whistle and the Coffee Pot café had almost sold out of
their boot scrapers, so I did a restock. While at Todders, I painted
the lettering on the four rail chairs in the production line. I think
we'll have just enough boot scrapers to get us to the end of the week.
Wednesday 30th
It felt like "one of those days …", seeming busy but not a lot to show for it!
Gil
& Bruce pondered over the bridge section on the pony frame, and
decided that it was not going to come off! It would be too dangerous to
have a flame under there heating the nuts - no easy escape route in
case of emergency when laying on your back under the loco! So, they
attacked the oval hole with an expandable reamer. Gil thus spent most
of the day reaming away. Progress was visible, but not completed by end
of play.
Similarly,
I played with the sand box mechanism, testing whether sand was escaping
from the slackness of the inner rod, or from a poor fit in the bottom
of the box. Possible both! Definitely getting between rod and tube. I
thought I'd try squeezing the tube across where the slots are in it,
thereby reducing the gap at the critical point. That appeared to be
better, but the sand test was not conclusive at going-home-time; so it
had to wait for the next time!
Saturday 2nd Jan 2016
One of those days where a lot of effort and not a lot to show for it!
Gil
spent the entire day using the expandable reamer to open out the hole
in the top bridge piece. The reamer passes through the hole and starts
then to work on the hole below it (at the same time). It then passes
through that hole and hit a beam underneath, stopping further progress!
We had to raise the loco chassis on the jacks, to increase the room
between bottom of bridge piece and the beam.
Bruce acted as Gil's gopher, and chief expander of the reamer. Gil thinks he's got two more days of this, yet!
Gil
set John T on removing bits in preparation for extracting the RHS valve
to measure its wear. The diagram attached shows how un-straightforward
this is! At one point, I had to assist John by standing on a molegrip
that was clutching the head of a round-headed bolt, to stop it from
turning while John was undoing the nut underneath.
I
messed around with the sandbox again. It seems to me that the tube is
not quite long enough to form a decent seal at the bottom. So, after
much experimenting & testing, I applied a dollop of silicone beading
around its bottom. With assistance from John, I got the sandbox back
in place … but could I get the split pin through the hole in one of the
linkages? [Rhetorical question!] Gave up and went home in the end!
Roger
Wednesday, 23 December 2015
Maintenance Update (flame, bitumen, truck)
Wednesday 16th
Gil
& John T were largely laying down on the job. We need to remove a
bridge section that holds the pony pivot pin, in order to ream the holes
out to a known size; and then make a new pin to suit. Needless to say,
this bridge is underneath the loco, which means either laying on the
floor and working upwards; or hanging over arbitrary beams and dangling
downwards!
All
morning, they tried to undo first the lock nuts and then (if they'd
have got that far) the main nuts. No joy! A flame thrower was
considered. JC [Loco Dept] had a go, and even he gave up. I suggested a
nut splitter. "Have you got one?" asked JC. Have we as heck! … but a
chisel is almost as good! Several chisels later, and they could see
some progress … but only then with the assistance of Ian Grant [Loco
Dept]. Many thanks, Ian!
Meanwhile,
John G was working on the boot scraper production line. The cafes had
sold 9 between them, last weekend, so we did a restock at Todders and
John painted five rail chairs that were already in primer coat. At
other times during the day, he acted as general gopher assisting me and
the nut cracker team.
Clive
& Ade [Loco Dept] applied a coat of bitumen paint to the rear
section of the tender top. A second coat in the coal space is planned
for Saturday.
I
removed the RHS sand box, which enabled me to get the delivery pipe
out. I then puzzled over how to stop sand from escaping, as there seems
to be a 1 mm gap between the central rod and its surrounding pipe …
ample space for the sand to escape through. In the end, Gil decided to
order some new pipe of a diameter to match the central rod.
Bruce
called in (with two eyes now synchronised) and looked for some metal
with which to make a couple of discs to replace those that were the
wrong sort over the pony lubrication points. He also suggested that,
since the bracket that held the (broken) oil delivery pipe is bent,
wouldn't it be a good idea to straighten it before fitting the new
components? My first thought was to take it off and straighten it, but
when I tested the first of four nuts, decided that today was one of
those days when all nuts were in refusal mode. So, with assistance from
John G, I fabricated a beam-and-screw set up, to pull the bent bracket
straight. By going-home time, this seemed to be working.
Saturday 19th
David
& Gil spent much of the day measuring every conceivable angle &
dimension of the wheelset. Partly to check for any almost-invisible
differences; partly to enable Carpo to machine the axlebox underkeeps
while the actual axle is away! To that end, Gil had two templates
machined to the exact size of the journals on the right- and left-hand
ends of the axle.
The
white metal in the axleboxes was in good condition apart from being too
"long" - that is, it protruded further than necessary, which had caused
a slight difficulty in lifting the box from the axle. David skimmed
the excess off.
David
& Gil finally turned their attention to that bridge section under
the loco, again. Even with the might of JC's arm, those nuts will not
move! Applying a bit of heat would probably loosen them, but it is in a
very dangerous position. The flame could only be applied from
underneath, which is a serious health risk - if anything went wrong, it
would be extremely difficult to get out of the way quickly. So, we are
still considering the options.
Bruce
popped in to demonstrate his improved eyesight. I think he's got x-ray
vision after his operation. Anyway, he took more measurements for his
"homework" concerning the bush in the pony frame and the oil delivery
pipes.
Cliff & Clive, assisted by Donna, [all Loco Dept] applied a second coat of bitumen paint to the tender coal space.
On
Tuesday, Gil & Geof are taking the pony wheelset to South Devon for
truing-up. To prevent the wheels from turning en route, I knocked up a
wooden plinth that will spread the load, support the wheel (as opposed
to the flange) and support chocks to prevent the wheels from rolling
(plus some blocks to prevent the chocks from slipping!).
To
prevent the journals from rusting, I smeared thick grease all over them
(didn't do my gloves any good!), wrapped cloth round them, then bin
liners and taped it all up.
Apart
from straightening the bent bar that holds the oil delivery thingy, I
turned my attention to boot scrapers ... cleaning four rail chairs and
painting their bottoms.
Monday 21st
Because
there has been a mini rush on boot scrapers, I popped down to Todders
to slap a primer on the tops of the Saturday four chairs.
P&O
was chuffing up & down, apparently testing out the third cylinder.
Previously, it had been running on only two cylinders!
Tuesday 22nd
I
arrived at 08.40 and just managed to get a crimson lake top coat on the
LMS chair before Geof & Gil arrived in the GWSR pick-up truck.
Carpo drove the fork-lift, and lifted the pony wheels onto pallets in
the back of the truck. The wheels were chocked and strapped. Even the
chocks were nailed down! We certainly don't want the wheels to go
a-wandering en route to Buckfastleigh.
On
the way home, I called in at Winchcombe station, where they had sold 4
boot scrapers … so, back to Todders to pick up four and do a restock!
Next work days:
Wednesday 23rd will be a low-key day. I expect I'll pop down and carry on with boot scraper production.
Saturday 26th is cancelled as a work day.
So, next real work day will be Wednesday 30 December.
Roger
Sunday, 13 December 2015
Maintenance Update (pony, disc, sand)
Wednesday 9th
As it was a sunny day, we were able to put the pony outside. Not out to grass, of course, but for a jolly good clean.
Meanwhile,
there was much debate about that oil delivery pipe that had been
snapped off in the dim & distant. From the drawings that Bruce had
found, what we had fitted was not correct anyway. There appears to be a
large disc that is pushed down onto the top cladding by the helical
spring. The drawing then says to insert rubber packing below that! So
we had a butcher's at the cladding piece, and, sure enough, there are
signs of there being a large circular cover having sat on its top in the
past. You can just make out the impression of a ring around the hole
in the cladding piece.
We
had a look beneath the 38xx and also the 42xx to see what is there.
Yup. A large disc. Actually, one felt like a rubber disc, to me,
whereas the other is shiny (brass or bronze, I guess). We chewed over
the options, and pored over the diagrams, and I think we've decided to
make a pair of large rings out of brass (or similar).
Inevitably,
neither of the drawing exactly matches our pony. Ours closely
resembles the diagram which shows coil springs (as "shock absorbers"),
but ours has a rubber sandwich (like on the second drawing!).
Just
out of interest (thinking about why the pony drifts to the left) I
compared the pony wheel diameters … :-) …. you might have guessed!
The RHS wheel is approx 1/16" larger diameter than the LHS.
We
rolled the pony back inside, and removed the tie-bars beneath the
axleboxes. This is necessary in order to drop the axleboxes out … well,
you can't "drop" them, as they sit on top of the axle! So, we need to
lift the whole frame up off the axle, whereupon the boxes will swing
round & drop off! I recall well, the re-wheeling at Llangollen, and
trying to keep axleboxes balanced on the top of their axles!
After
doing all that we could, and wanting only to have some form of lifting
gear, we were forced to adjourn. There is a gantry .. in the far
corner, behind Dinmore's tender, P&O, and the 55xx. Some shunting
is required to gain access, then we can wheel it round and tackle the
lift.
Friday 11th
Secondly,
I thought I'd do a second test of the pony wheel diameters. I measured
each wheel in two directions (at 90 degrees). They are not far off
being round! There's only about 0.1 mm difference on each (which is
probably within my measurement limits anyway). However, the right-hand
wheel is about 1.2 mm larger in diameter than the LHS.
Carpo
very kindly rang up South Devon, who advised that the wheels do need to
be turned down to remove this difference, otherwise the pony truck will
veer to the left. [… which it does!]
Saturday 12th
Having
split the bush, it was easy to push out just using a lump hammer. Gil
was able to measure the internal diameter ready to order a new bush
(i.e. with a "round" hole in the centre!).
John
T, John G, David & Gil worked on the wheelset. Careful lifting of
the frame, pieces of wood beneath the axleboxes, and a touch of
persuasion separated the frame from wheels.
The axleboxes were a fairly
tight fit in the guides - probably a good thing (though Gil expressed
concern that somehow they might have got twisted, and hence tight! Ever
the pessimist). Photo: David & John T removing the lifting chains.
The
white metal bearing surfaces are not bad. One side thrust face is
worn, where the drift to the left had applied more pressure to that
surface. The journals are in good condition, too. Once apart, we could
see that there is exactly the same number of rubbers in the LHS as in
the RHS - it seems that the covers over them are different on each side
(hence the apparent difference in height).
David and John T took the
boxes outside and gave them a good clean.
Gil
seemed to spend the rest of the day measuring things. David had a go
at removing the slide plates (the angled surfaces) which appear to be
bolted down with counter-sink screws. They wouldn't budge using an
ordinary screwdriver, so David tried using an impact driver. However,
this was less than 100% successful, as the driver not only undid the
screw, but promptly did it up again! The mechanism's functionality is
suboptimal. David attempted to fix it, but gave up in the end.
Cliff
& Clive [Loco Dept] spent the morning applying a layer of bitumen
paint to the tender coal space. Another coat will go on next Wednesday.
JC
[Loco Dept] asked if we could do a bright red rail chair for next
year's Santa Specials, so that the diesel rail car driver knows where to
stop. John G duly applied Signal Red to a chair. I'll drop that down
to Winchcombe today (Sunday).
Gil
wants to measure the cylinder internals to check for wear, so John G
removed the front cladding from the cylinder covers in readiness.
I
have been slightly concerned about the RHS rear sandbox that
permanently dribbles sand (provided the box started off with some in, of
course), so I decided to investigate. Removing the sandbox's bottom
was a bit of a struggle - I think the protruding threads on the
retaining bolts had suffered from being covered in sand. John G toddled
off and dug out 8 shorter bolts (which amazed both of us … not that he
went, but that he found some!). Buried in the sand I came across a
spanner!
The delivery mechanism consists of an outer pipe with some
slots in, and an inner rod with some lengthways recesses. Turn the rod
such that the recesses line up with the slots, and sand pours out.
Except that there is enough wear in the pipe that sand can squeeze
between pipe and rod, and escape anyway! Getting the rod part out was
not too difficult, but the pipe part only comes out of the top of the
box … and hits the running board before you can get it out. This means
that the whole sandbox has to come off.
But, one of the side bolts
happens to also attach the battery box (batteries were used for the
Automatic Warning System) .. so that has to come off, too! … at which
point, everyone else had gone home … so I did, as well.
Roger